ePROMISePROMIS
Blog
Best Practices for Managing BOM in Modern Manufacturing

ePROMIS Solutions6 min read

In manufacturing, one of the most crucial steps is creating a bill of materials (BOM). Also referred to as a product recipe, assembly component list, or product structure, a BOM plays a critical role in ensuring the efficiency of numerous processes, including production planning, inventory management, materials requirement planning, scheduling, and cost estimation.

What Is a Bill of Materials (BOM)?

A bill of materials (BOM) is a structured list of all the materials, components, and parts necessary to produce or repair a product. This list includes details such as material names, descriptions, quantities required, and costs. Additionally, a BOM contains procurement and usage instructions for each item, making it a comprehensive guide to manufacturing a product.

A BOM is essentially the blueprint for building a product. It outlines the specific materials and components, organizes them hierarchically, and breaks down the manufacturing process into subassemblies, components, and detailed steps. The top of the BOM hierarchy represents the finished product, while lower levels represent the subassemblies and components required for assembly.

Managing and maintaining an accurate BOM is critical, especially for complex products with hundreds or thousands of parts. For instance, if a specific component needs to be replaced due to a supply issue, this change must be updated throughout the BOM wherever that component is used.

Why Is a BOM Important?

A BOM helps manufacturers ensure efficient and accurate production by identifying all materials and components before production begins. This upfront planning minimizes the risk of material shortages or overages, both of which can lead to production delays, additional costs, and scheduling issues.

By using a BOM, companies that outsource manufacturing can provide contract manufacturers with clear instructions, ensuring that the final product meets the required specifications. Without a BOM, the likelihood of mistakes increases, such as missing materials, improper assembly, and higher costs due to rush orders or expediting fees.

Who Prepares and Uses a Bill of Materials?

Creating a BOM typically requires collaboration across multiple departments, including design, engineering, purchasing, materials management, and production. Each department contributes specific details about the materials, components, and processes required.

Once the BOM is finalized, different departments will use it depending on their needs. For instance, the engineering team may utilize an engineering BOM to manage product design, while the production team uses a manufacturing BOM to guide assembly.

10 Essential Elements of a Bill of Materials (BOM)

A typical BOM includes several key elements, ensuring that all necessary information is captured for production. Here are the 10 most essential components of a BOM:

  1. BOM Level: This is a unique number that indicates where each component fits within the hierarchy of the BOM. For example, in a BOM for a car, the engine would be a top-level component, while the pistons and crankshaft within the engine would be sub-level components.
  2. Part Number: Every material or component has a unique part number, making it easier to identify and track during the production process. Part numbers can be intelligent (containing descriptive information) or non-intelligent (randomly generated).
  3. Part Name: Each part also has a unique name, which further helps with identification.
  4. Phase: This indicates the lifecycle stage of the component, such as "in design" or "in production."
  5. Description: A detailed description of each part is provided, which helps differentiate between similar parts, such as different sizes of screws.
  6. Quantity: The quantity specifies how many units of each part are needed for the assembly. For instance, two piston rings might be required for each piston cylinder.
  7. Unit of Measure: This indicates how the part is measured and procured. For example, wiring might be purchased by the foot, while screws could be bought by weight.
  8. Procurement Type: This indicates how the part is acquired, whether it's produced internally, purchased from a supplier, or subcontracted.
  9. Reference Designator: Used primarily for circuit board assemblies, this designator indicates the location of a part within the assembly.
  10. BOM Notes: Additional information, such as alternative suppliers or material specifications, can be included in this section.

The Importance and Value of a BOM

A well-constructed BOM provides a single source of truth for all materials, components, and assemblies needed to build a product. This minimizes production delays, improves inventory accuracy, and ensures that materials are available at the right time in the correct quantities. A BOM also contributes to consistency, ensuring that every production run follows the same guidelines and maintains product quality.

Additionally, BOMs are critical for troubleshooting product failures. By referencing the BOM, manufacturers can identify the exact components used in a defective product, helping to pinpoint the source of the problem.

Types of Bill of Materials (BOM)

Various types of Bills of Materials (BOMs) are utilized at different phases of the product lifecycle. The primary types include:

  1. Engineering Bill of Materials (EBOM): Created during the design phase, this BOM outlines the original design of a product, including all components and subassemblies. Engineers typically use computer-aided design (CAD) software to develop an EBOM.
  2. Sales Bill of Materials (SBOM): Used to manage sales orders, this BOM lists the products and components required to fulfill customer orders. The SBOM includes the finished product and the individual components necessary to assemble it.
  3. Manufacturing Bill of Materials (MBOM): Used during the production phase, this BOM includes all parts, materials, and assemblies needed to manufacture the product. It also accounts for waste and items consumed during the production process.
  4. Configurable Bill of Materials: This type of BOM is used for products that are customizable based on customer specifications. It lists the components needed to produce the product according to the customer’s requirements.
  5. Production Bill of Materials: This BOM serves as the foundation for production orders, detailing all components and materials that need to be converted into finished goods.
  6. Assembly Bill of Materials: This BOM is used to manage the assembly of a product, listing all subassemblies and components.
  7. Template Bill of Materials: These flexible BOMs can be used for both production and sales purposes and include parent and child components.

The Two BOM Structures

BOMs can be structured in one of two ways:

  1. Single-level Bill of Materials: This BOM lists all parts required to build a product but does not show the relationships between subassemblies and components. It is simple to create but lacks the depth needed for complex products.
  2. Multi-level Bill of Materials: A more detailed structure, this BOM shows the relationships between parent components and their subassemblies. This allows for better traceability and is ideal for complex products.

Creating a BOM in 7 Steps

Building an accurate and effective BOM involves several steps:

  1. Determine the Data to Include: Decide which materials and components will be listed, including consumables like adhesives or wire.
  2. Centralize Control: Ensure that the BOM pulls information from all relevant departments to maintain accuracy.
  3. Limit Editors: Restrict the number of people who can make changes to minimize errors.
  4. Track Revisions: Ensure that any changes to the BOM are tracked and logged.
  5. Choose the BOM Structure: Decide whether a single-level or multi-level BOM is more appropriate for your product.
  6. Start Listing Components: Begin documenting all necessary materials and parts.
  7. Continuously Update: As the product evolves, refine and update the BOM to ensure it remains accurate.

History of the Bill of Materials

The concept of the BOM has its roots in World War I, when materials management became critical for production efficiency. By the 1960s, manufacturing techniques such as Toyota’s Just-in-Time (JIT) method and Materials Requirements Planning (MRP) advanced the use of BOMs. These methods allowed manufacturers to better plan inventory and production processes, leading to widespread adoption of BOMs across industries.

Optimize BOMs with ERP Systems

Managing BOMs manually can be time-consuming and error-prone. Enterprise Resource Planning (ERP) systems like ePROMIS offer powerful tools for automating BOM creation and management. With features that help track changes, manage inventory, and ensure accuracy across departments, ERP solutions streamline the entire production process, improving efficiency and reducing costs.

Conclusion

An accurate and comprehensive BOM is essential for any manufacturing organization. It provides a clear roadmap for production, helps ensure consistent product quality, and minimizes costly delays. By integrating BOMs with advanced ERP systems like ePROMIS, businesses can take their production efficiency to the next level, ensuring seamless coordination between design, engineering, procurement, and manufacturing.

Share

See it in ePROMIS

Every line, every batch

Output, quality and dispatch for every line, with the one below target in red.

Live dashboard

Every figure on one screen